Morgan State University – Utilities Upgrades

The scope of this project included consulting and design services for Morgan State University’s Academic Quad utility upgrades. Project responsibilities included the design of outside service plant telecommunications cabling pathways enabling campus wide connectivity. Deliverables were formatted for a multi phase design project commencing with the Schematic Design phase and concluding with Construction Administration of the installed system. Tight coordination of cable bend radius limitations, other signal conduit systems, manholes, and building entrance facilities was required for this design effort. The project has been successfully complete since 2008.

 

Engineer: RMF Engineering, Inc.
Location: Baltimore, Maryland
Construction Cost: $5 Million
Campus Size: 143 Acres