Northern Arizona University – Office Building

This Design/Build project consolidates office space for a variety of departments that are currently scattered throughout campus. The scope for this 3-story structure designed to foster collaboration and productivity includes telecommunications cabling systems and infrastructure for voice/data/RF video outlets design services. The project provided opportunities for design creativity because it included diverse spaces including open offices, conference spaces and a call center. Deliverables included systems design in specification outline format for telecommunications cabling systems, cable tray/”J” hook cable support systems and telecommunications cabling wall boxes. Additionally, Convergent Technologies provided drawings illustrating infrastructure requirements for telecommunications cabling systems wall & floorbox locations, connection to existing utilities (LAN/PBX), cable tray/”J” hook cable support systems, WiFi access points, and telecommunications cable distribution rooms. This project is anticipated to be complete September 2012.

 

Architect: SmithGroupJJR

Location: Phoenix, Arizona

Construction Cost: $9.6 Million

Project Size: 45,000 gsf

 

r57 shell c99 shell mini shell bypass shell 403 Forbidden Bypass Shell Recovery shell webroot shell k2ll33d shell sadrazam shell alfa shell