Loading
  • Link to LinkedIn
  • Home
  • Careers
  • Contact
CTDG - Convergent Technologies Design Group, Inc.
  • About Us
    • Our Story
    • Our Process
    • Featured Projects
    • Testimonials
    • Careers
  • Markets
    • Business Schools
    • Commercial
    • Courtrooms & Law Schools
    • Data Centers
    • Emergency Operations & Public Safety
    • Environments for Aging
    • Federal Government
    • Financial & Banking
    • Healthcare
    • Higher Education
    • Hospitality & Gaming
    • Houses of Worship
    • K-12
    • LEED Certified Projects
    • Libraries
    • Mixed-Use Residential
    • Museums & Cultural Centers
    • Proton Facilities
    • Radio, TV & Recording Studios
    • Recreation & Wellness
    • Schools of Health & Medicine
    • Science & Technology
    • Theaters & Performing Arts Venues
  • Services
    • Acoustics, Noise & Vibration Control
    • Audiovisual Planning & Multimedia Systems
    • Electronic Security Systems
    • Healthcare Low Voltage Systems Design
    • Telecommunications Cabling Systems
    • Theatrical Lighting Design
  • Our Work
    • Ruth Bader Ginsburg Hospital
    • Georgetown University Law Center, Hart Auditorium (McDonough Hall)
    • Duquesne University – College of Osteopathic Medicine
    • MGM Resorts International, National Harbor
    • George Mason University – Horizon Hall
    • National Institutes of Health (NIH) Building 10
    • US Department of Energy, NREL Laboratory
    • Virginia Commonwealth University, Children’s Hospital
  • News
  • Education
  • Menu Menu
Audiovisual, Business Schools, Higher Education, Projects, Telecommunications

Bowie State University – Center for Business and Graduate Studies

Higher Education: Bowie State University, Bowie MD, Electronically Tintable SageGlass – Systems by CTDG

[slideshow_deploy id=’3105′]

Architect:
Gaudreau, Inc.; The Stubbins Associates, Inc. (KlingStubbins)

Location:
Bowie, Maryland

Construction Cost:
$15 Million

Project Size:
76,000 gsf

 

Highlights of this $1.5 million dollar educational technology systems project include: audiovisual presentation and recording, videoconferencing, video editing, and audio/video production along with the supporting inside/outside telecommunications cable plant with associated infrastructure. The types of spaces to receive audiovisual presentation systems included large format displays, tiered 60-seat videoconferencing classrooms with control room, multiple 40-seat multimedia instructional classrooms, networking and small group laboratories, conference rooms, collaborative group study type spaces, and seminar rooms. Scope of design work included the complete specifications and project management for all audiovisual and telecommunications cabling for voice, data and RF video signals into the new building. Construction specification deliverables outlining procedures and methods of connecting to existing campus telecommunications networks were provided. Designers worked closely with the owner’s media operations group to determine both functionality and cost priorities for the audio/visual systems that are specified. Other project responsibilities included room acoustics and mechanical systems noise and vibration control for all classroom spaces throughout the new facility. The project was a four-year design/construction, successfully completed in June 2007.

 

Share this entry
  • Share on LinkedIn
  • Share by Mail
https://ctdginc.com/wp-content/uploads/2024/07/Convergent-Technologies-Design-Group_Audiovisual-Telecom-Acoustics-Security-Low-Voltage_059.jpg 1118 1500 admin https://ctdginc.com/wp-content/uploads/2024/06/Convergent-Technologies-Design-Group-Logo_340x156px-72dpi_Green-and-Black-Logo.png admin2018-05-11 18:24:392024-12-31 09:38:31Bowie State University – Center for Business and Graduate Studies

Recent Posts

  • Outstanding Design Award!
  • Outdoor Audiovisual System Solutions at Eastern Carolina University
  • Project Spotlight: The Zayed Bloomberg Building Underwent a Major Upgrade for Next-Gen Healthcare
  • Project Spotlight: Grand Opening of the New Stockton University Residence Hall
  • Project Spotlight: USDA Forage-Animal Production Research Unit at the University of Kentucky

Categories

  • Acoustics
  • Audiovisual
  • Award Received
  • Business Schools
  • Court Rooms and Law Schools
  • Cultural
  • Data Centers
  • Emergency Operations
  • Federal
  • Healthcare
  • Higher Education
  • Hospitality
  • Hospitality and Gaming
  • HVAC
  • K-12
  • LEED
  • Libraries
  • Lighting
  • low voltage healthcare
  • Markets
  • Municipal
  • Museums
  • News
  • Projects
  • proton
  • Proton Center
  • Public Safety
  • Radio TV and Recording Studios
  • rec and wellness
  • Schools of Health
  • Science and Technology
  • Security
  • Telecommunications
  • Theaters and Performing Arts
  • Uncategorized

ARIZONA
4651 South Lakeshore Drive
Tempe, Arizona 85282
v: 480.345.9951
f: 480.345.9952

NEW YORK
448 W 37th Street, 7D
New York , New York 10018
v: 646.475.5116
f: 646.475.5117

MARYLAND
6501 York Road
Baltimore, MD 21212
v: 410.532.2395
f: 410.532.2396

ARIZONA
4651 South Lakeshore Drive
Tempe, Arizona 85282
v: 480.345.9951
f: 480.345.9952

NEW YORK
448 W 37th Street, 7D
New York , New York 10018
v: 646.475.5116
f: 646.475.5117

MARYLAND
6501 York Road
Baltimore, MD 21212
v: 410.532.2395
f: 410.532.2396

©2025 Convergent Technologies Design Group, Inc. All rights reserved.

Site designed by Mostyn Marketing Group / Built Creative.   |   Privacy Policy   |   Terms of Use   |   Site Map

  • Link to LinkedIn

©2025 Convergent Technologies Design Group, Inc. All rights reserved.

Site designed by Mostyn Marketing Group / Built Creative.

Privacy Policy   |   Terms of Use   |   Site Map

  • Link to LinkedIn

Scroll to top Scroll to top Scroll to top