Architect: Moseley Architects Location: Blacksburg, Virginia Construction Cost: $9 Million Project Size: 49,000 gsf LEED: Gold Description The scope of this project includes complete design for all telecommunications and audiovisual infrastructure as it relates to the renovation of Henderson Hall, the oldest building on the Virginia Tech campus. Space plans include: a 8,000 sq. ft.
+ Read More
Architect: Kilment Halsband Architects MEP Engineer: BR+A Consulting Engineers Contractor: Turner Construction Company Location: New York, New York Project Size: 40,000 GSF Project Budget: $50 MILLION LEED: Gold Description: Part of the north campus revitalization project, a five year construction effort, the Welch Hall refurbishment project links the north and south parts of the campus
+ Read More
Oakland University’s new Human Health Building will bring the Schools of Nursing and Health Sciences under one roof to foster multidisciplinary collaboration. The scope of this project includes a $1.1 Million design to budget for educational technology systems. Convergent Technologies is providing audiovisual systems design services for simulation systems and multimedia presentation systems. The five-story
+ Read More
Architects: Richter Cornbrooks Gribble – Baltimore, MD Ellenzweig – Cambridge, MA Location: Baltimore, Maryland Construction Cost: $67 Million Gross Square Footage: 112,565 square feet Leed: Gold Description The scope of this project includes a $2.2 Million design to budget for technology systems. Convergent Technologies provided complete design services for telecommunications cabling systems with associated supporting
+ Read More
Architect: Ayers Saint Gross Architects Departments: Seidel School of Education and Professional Studies Department of Information Technology Integrated Media Center Teaching Learning Network Location: Salisbury, Maryland Construction Cost: $58 MILLION Gross Square Footage: 165,000 gross square feet LEED Certification: Silver The scope of this project includes a $4 million dollar design to budget for
+ Read More
PROPERTY: Chesapeake Bay Foundation – Gateway Conference Center LOCATION: Annapolis, Maryland ARCHITECT: SmithGroup, Inc. LOW VOLTAGE CONSULTANT: FORTRAN Communications CONSTRUCTION COST: $7.2 MILLION GROSS SQUARE FOOTAGE: 32,000 gross square feet LEED CERTIFICATION: Platinum Description The scope of this project included a $275,000.00 design to budget for audiovisual (AV) & multimedia systems to include: speech reinforcement,
+ Read More
Architect: Flad & Associates Location: Aberdeen, Maryland Construction Cost: $230 MILLION Gross Square Footage: 300,000 square feet LEED: Silver The scope for the US Army Medical Research Institute of Chemical Defense (USAMRICD) included the design of audiovisual systems and its associated infrastructure. Project responsibilities included heat load figures, AC power requirements and special
+ Read More
The scope of work for the Maricopa County Community College District, Saguaro Building at Mesa Community College, Red Mountain Campus included design services for audiovisual systems with associated supporting infrastructure and telecommunications infrastructure for voice/data/RF video outlets. The facility blends arts and sciences in a unique venue that provides for life sciences, research labs and
+ Read More
4651 South Lakeshore Drive
Tempe, Arizona 85282
v: 480.345.9951
f: 480.345.9952
448 W 37th Street, 7D
New York , New York 10018
v: 646.475.5116
f: 646.475.5117
6501 York Road
Baltimore, MD 21212
v: 410.532.2395
f: 410.532.2396