Loading
  • Link to LinkedIn
  • Home
  • Careers
  • Contact
CTDG - Convergent Technologies Design Group, Inc.
  • About Us
    • Our Story
    • Our Process
    • Featured Projects
    • Testimonials
    • Careers
  • Markets
    • Business Schools
    • Commercial
    • Courtrooms & Law Schools
    • Data Centers
    • Emergency Operations & Public Safety
    • Environments for Aging
    • Federal Government
    • Financial & Banking
    • Healthcare
    • Higher Education
    • Hospitality & Gaming
    • Houses of Worship
    • K-12
    • LEED Certified Projects
    • Libraries
    • Mixed-Use Residential
    • Museums & Cultural Centers
    • Proton Facilities
    • Radio, TV & Recording Studios
    • Recreation & Wellness
    • Schools of Health & Medicine
    • Science & Technology
    • Theaters & Performing Arts Venues
  • Services
    • Acoustics, Noise & Vibration Control
    • Audiovisual Planning & Multimedia Systems
    • Electronic Security Systems
    • Healthcare Low Voltage Systems Design
    • Telecommunications Cabling Systems
    • Theatrical Lighting Design
  • Our Work
    • Ruth Bader Ginsburg Hospital
    • Georgetown University Law Center, Hart Auditorium (McDonough Hall)
    • Duquesne University – College of Osteopathic Medicine
    • MGM Resorts International, National Harbor
    • George Mason University – Horizon Hall
    • National Institutes of Health (NIH) Building 10
    • US Department of Energy, NREL Laboratory
    • Virginia Commonwealth University, Children’s Hospital
  • News
  • Education
  • Menu Menu
Audiovisual, Higher Education, Projects, rec and wellness, Telecommunications

Coppin State University Physical Education Complex

[slideshow_deploy id=’3329′]

Architect:
Hord, Coplan Macht; Sasaki Associates

Location:
Baltimore, Maryland

Construction Cost:
$109 Million

Project Size:
234,000 gsf

The scope of this project for Coppin State University includes complete technology systems design services for: telecommunications cabling systems (voice, data, RF Video), audiovisual presentation systems, Local Area Network (LAN), Voice Over Internet Protocol (VOIP)/Private Branch Exchange (PBX), and Wireless Fidelity (Wi-Fi) electronics. The types of spaces to receive technology systems include: a 4000-seat Arena, Auxiliary Gymnasium, Tape Storage/Review Room, Competitive Pool, Dance/Fitness Rooms, Multipurpose Room, Conference/Meeting Rooms, 40 & 50-seat Classrooms, Physical Education Computer Lab/Studio, and Outdoor Playing Fields. Scope of design work includes the complete specifications and project management for all telecommunications cabling for voice, data and RF video signals into the new building from existing campus distribution points. Specifications include details outlining procedures and methods of connecting to existing campus telecommunications networks. Additional responsibilities include the review of building criteria as they apply to acoustics, noise and vibration for the Arena and other noise critical spaces, the development of acoustical criteria for HVAC equipment noise levels and sound isolation, and recommendations for room layout, shaping, and acoustical finishes. Project scope includes complete programming narrative system overview descriptions and detailed per space cost estimating for all technology systems. The project is currently in the Construction Administration phase with construction scheduled to be complete Winter 2009.

https://ctdginc.com/wp-content/uploads/2024/12/Recreation-and-Wellness_Coppin-State-University_Physical-Education-Complex_by-CTDG_01.jpg 996 1500 admin https://ctdginc.com/wp-content/uploads/2024/06/Convergent-Technologies-Design-Group-Logo_340x156px-72dpi_Green-and-Black-Logo.png admin2018-05-11 18:39:152024-12-31 09:36:43Coppin State University Physical Education Complex
Acoustics, Audiovisual, Higher Education, Projects, Schools of Health, Telecommunications

Coppin State University – Health and Human Services Building

[col3]The scope of this project includes a $3.5 million design to budget for educational technology systems to include: healthcare observation & recording, immersion classroom distance learning, internet based classroom teaching systems, audiovisual presentation and recording, program/speech audio reinforcement, custom instructor’s stations, telecommunications cabling (voice, data, RF Video), as well as network, wireless, and telephony electronics. The types of spaces to receive educational technology systems include: 100-seat lecture hall, general classrooms/laboratories, seminar classrooms, distance learning center, moot court room, technology center, computer labs, observation/exam rooms, demonstration/counseling rooms, and meeting/conference rooms. Design responsibilities include program verification, drawing documentation, specification preparation, and construction administration for all audiovisual systems, telecommunications cabling systems, and acoustics, noise & vibration control analysis. Specifications include procedures and methods for connecting existing campus telecommunications networks and expanding campus infrastructure to incorporate the 100% growth of outlet counts on the campus as a result of this new project. Additional responsibilities include the review of building criteria as they apply to acoustics, noise and vibration control for all acoustically sensitive spaces, mechanical systems, and a nearby railway line. Project opportunities include working with campus technical staff to incorporate cutting edge Internet based learning software [Tegrity] into classroom instructional technology systems, and the integration of audiovisual recording/monitoring over the local area network. This project has been successfully complete since spring 2009.[/col3]

 

[col3]LOCATION: Baltimore, Maryland

ARCHITECT: Design Collective, Inc.

CONSTRUCTION COST: $50 MILLION

GROSS SQUARE FOOTAGE: 160,000 square feet

[/col3]

 

https://ctdginc.com/wp-content/uploads/2024/06/CTDG-Convergent-Technologies-Design-Group-Inc-Logo-on-Blue.png 1000 1500 admin https://ctdginc.com/wp-content/uploads/2024/06/Convergent-Technologies-Design-Group-Logo_340x156px-72dpi_Green-and-Black-Logo.png admin2018-05-11 18:37:322024-12-31 09:36:50Coppin State University – Health and Human Services Building
Acoustics, Audiovisual, Museums, Projects, Telecommunications

College Park Airport – Operations Building

[col3]The College Park Airport is the world’s oldest continuously operating airport. Founded in 1909 for the Wright Brothers instruction of the first military aviators, the airport is now run as both a historic site and operating general aviation airport. It was added to the National Register of Historic Places in 1977. The Aviation Museum is an Affiliate of the Smithsonian Institution and depicts the airport’s history. The Museum operates as a public museum providing educational exhibits, special events, programs and tours for the general public, children and tourists. The scope of this project includes the Expansion of the Airport Operations Building. Convergent Technologies is providing complete design services for audiovisual and telecommunications cabling systems with associated supporting infrastructure, as well as acoustics, noise and vibration control. The existing Airport Operations Building will be expanded by approximately 5,000sf and will include Administrative Office space for the Airport Manager, Airport Operations and Security Staff, a Pilot/Passenger Waiting Lounge, Public Lobby and Aircraft Storage and Maintenance as well as a Pilot Briefing Room/Flight Plan Filing. The Pilot Briefing Room is designed as a conferencing space capable of presenting digital media via a flat panel display as well as from a projection system. The Airport Operations Building will also include a new Data Center. Multimedia systems are being designed to enhance the administration of the aviation museum, and the experience of the visitors as well as the airport operation. This project is currently in the design phase with completion scheduled for 2013.[/col3]

 

[col3]LOCATION: College Park, Maryland

ARCHITECT: Moody/Nolan, Inc.

CONSTRUCTION COST: $8 MILLION

GROSS SQUARE FOOTAGE: 7,000 gross square feet

[/col3]

https://ctdginc.com/wp-content/uploads/2024/06/CTDG-Convergent-Technologies-Design-Group-Inc-Logo-on-Blue.png 1000 1500 admin https://ctdginc.com/wp-content/uploads/2024/06/Convergent-Technologies-Design-Group-Logo_340x156px-72dpi_Green-and-Black-Logo.png admin2018-05-11 18:36:262024-12-31 09:37:00College Park Airport – Operations Building
Audiovisual, Data Centers, Higher Education, Projects, Science and Technology, Security, Telecommunications

College of Southern MD – Francis P. Chiaramonte, M.D. Center for Science and Technology

Libraries: City of Apache Junction, Arizona, Library Additions – Systems by CTDG
Libraries: McDaniel College, Hoover Library Renovations – Systems by CTDG
Libraries: McDaniel College, Hoover Library Renovations – Systems by CTDG
Libraries: McDaniel College, Hoover Library Renovations – Systems by CTDG
Libraries: McDaniel College, Hoover Library Renovations – Systems by CTDG

 

LOCATION:
La Plata, Maryland

ARCHITECT:
Design Collective

CONSTRUCTION COST:
$14 MILLION

GROSS SQUARE FOOTAGE:
70,000 gross square feet

 

The scope of this project included complete design services for educational technology systems to include: telecommunications cabling (voice, data, RF Video), audiovisual & multimedia, A/V monitoring for classrooms/labs, speech reinforcement, data projection, audiovisual presentation and recording in classrooms, along with custom instructor’s stations and associated infrastructure for approximately twelve (12) classrooms. The Science and Technology (ST) Building Renovation also included renovation of the existing ST Building and the phased relocation of the campus Telecommunications Hub. The ST Building current MDF Room was one of the two main distribution points of voice, data, and video for the entire campus, and was being relocated from its present location in the basement of the ST Building to the Learning Resource (LR) building MDF, which was better sized to support current demand and projected future growth of the campus Telecommunications Cabling needs. Project scope included design of a new campus hub room for this and other campus buildings, support for intermediate distribution rooms (IDF), the design of one of the campuses main distribution rooms (MDF) for voice, data, RF video systems, and installation of a redundant ductbank conduit system between the Science and Technology building and the Learning Resource Building. Scope of design work included the basis for design, design development, specifications and project management for all security systems for the project, telecommunications cabling, and audiovisual & multimedia systems infrastructure to be integrated into the new building. Project highlights include planning of phase construction for no down time integration of the new telecommunications distribution facility, as well as, close interaction with the college’s facilities and telecommunications staff enabling Convergent Technologies to gain a good understanding of existing conditions and future campus vision as it related to telecommunications cabling infrastructure. The project was a three-year, multi-phase design project and has been successfully complete since Fall 2008.

https://ctdginc.com/wp-content/uploads/2018/05/chiaramonte.jpg 386 800 admin https://ctdginc.com/wp-content/uploads/2024/06/Convergent-Technologies-Design-Group-Logo_340x156px-72dpi_Green-and-Black-Logo.png admin2018-05-11 18:35:062024-12-31 09:37:07College of Southern MD – Francis P. Chiaramonte, M.D. Center for Science and Technology
Audiovisual, Business Schools, Higher Education, Projects, Telecommunications

Bowie State University – Center for Business and Graduate Studies

[slideshow_deploy id=’3105′]

Architect:
Gaudreau, Inc.; The Stubbins Associates, Inc. (KlingStubbins)

Location:
Bowie, Maryland

Construction Cost:
$15 Million

Project Size:
76,000 gsf

 

Highlights of this $1.5 million dollar educational technology systems project include: audiovisual presentation and recording, videoconferencing, video editing, and audio/video production along with the supporting inside/outside telecommunications cable plant with associated infrastructure. The types of spaces to receive audiovisual presentation systems included large format displays, tiered 60-seat videoconferencing classrooms with control room, multiple 40-seat multimedia instructional classrooms, networking and small group laboratories, conference rooms, collaborative group study type spaces, and seminar rooms. Scope of design work included the complete specifications and project management for all audiovisual and telecommunications cabling for voice, data and RF video signals into the new building. Construction specification deliverables outlining procedures and methods of connecting to existing campus telecommunications networks were provided. Designers worked closely with the owner’s media operations group to determine both functionality and cost priorities for the audio/visual systems that are specified. Other project responsibilities included room acoustics and mechanical systems noise and vibration control for all classroom spaces throughout the new facility. The project was a four-year design/construction, successfully completed in June 2007.

 

https://ctdginc.com/wp-content/uploads/2024/07/Convergent-Technologies-Design-Group_Audiovisual-Telecom-Acoustics-Security-Low-Voltage_059.jpg 1118 1500 admin https://ctdginc.com/wp-content/uploads/2024/06/Convergent-Technologies-Design-Group-Logo_340x156px-72dpi_Green-and-Black-Logo.png admin2018-05-11 18:24:392024-12-31 09:38:31Bowie State University – Center for Business and Graduate Studies
Acoustics, Audiovisual, Court Rooms and Law Schools, Projects, Security, Telecommunications

Bowie City Hall – New City Hall

[slideshow_deploy id=’3121′]

 

Architect:
Grimm & Parker Architects

Location:
Bowie, Maryland

Construction Cost:
$23.7 Million

Project Size:
80,000 gsf

 

The scope of this project includes complete design services for technology systems to include: telecommunications cabling systems (data/voice/RF video) with associated supporting infrastructure, audiovisual systems with associated supporting infrastructure, access control / video surveillance security sysems and acoustics, noise & vibration control. The New City Hall will house the Bowie Police Department and most of the City Government’s administrative offices including the City Manager, Planning & Economic Development, Information Technology, Finance, Human Resources, Community Services, and Animal Control. The primary spaces to receive technology: the new Council Chambers, public meeting spaces, conference rooms, fitness room, and an emergency command center. Design highlights include the new Council Chambers which features broadcast and recording capabilities, the ability to edit/add character generation or graphic layovers in real time during council sessions and recording capabilities between the Council Chambers and the television studio in an existing building. Common areas throughout the building will receive digital signage to include flat panel displays that will feature room scheduling and other building information. Specified systems include: audiovisual presentation & remote control systems, program/speech audio reinforcement, audiovisual recording, digital annotation devices, video recording & broadcasting. Project responsibilities include cost estimating and project management through Construction Administration for all technology systems. In consideration of owner comments and requirements, Convergent Technologies provided future proofing of all audiovisual infrastructure and planned infrastructure for wireless access points. Additional project responsibilities include the development of acoustical criteria for all acoustically sensitive spaces throughout the building. The City recently procured a General Contractor for $10 Million less than project estimates. This project has been completed since Fall of 2011.

 

https://ctdginc.com/wp-content/uploads/2018/05/RockvilleCourt.jpg 531 708 admin https://ctdginc.com/wp-content/uploads/2024/06/Convergent-Technologies-Design-Group-Logo_340x156px-72dpi_Green-and-Black-Logo.png admin2018-05-11 18:22:182024-12-31 09:38:38Bowie City Hall – New City Hall
Audiovisual, K-12, Projects, Telecommunications

Baltimore County Public Schools – Perry Hall Middle School

[col3]The scope of this project included complete design services for telecommunications cabling systems with associated infrastructure and audiovisual systems infrastructure as they pertain to the systematic renovations at Perry Hall Middle School. The two-story building, constructed in the mid-1960s, required upgrades to general and specialty classrooms and building systems to support the renovation. This project also provided upgrades to the school kitchen. Project responsibilities include identifying wireless access points, and planning audiovisual systems infrastructure to support ceiling mounted projectors, equipment racks and instructor’s stations. Systems infrastructure was designed to future proof the renovated spaces and their programmed uses. This project was a two-year design and construction effort completed in October 2008.[/col3]


[col3]Architect: Colimore Thoemke Architects
MEP Engineer: Burdette, Koehler, Murphy & Associates, Inc. (BKM)
Location: Baltimore, Maryland
Construction Cost: $11 Million
Project Size: 228,000 gsf[/col3]

https://ctdginc.com/wp-content/uploads/2024/06/CTDG-Convergent-Technologies-Design-Group-Inc-Logo-on-Blue.png 1000 1500 admin https://ctdginc.com/wp-content/uploads/2024/06/Convergent-Technologies-Design-Group-Logo_340x156px-72dpi_Green-and-Black-Logo.png admin2018-05-11 18:19:072024-12-31 09:38:51Baltimore County Public Schools – Perry Hall Middle School
Acoustics, Audiovisual, K-12, Projects, Telecommunications

Baltimore County Public Schools – Kenwood High School

[col3]The scope of this project for Baltimore County Public Schools included complete design services for telecommunications cabling systems with associated infrastructure for voice/data/video, audiovisual systems infrastructure and acoustics, noise & vibration control. The purpose of this project was to upgrade the existing Technical Education Wing and add classroom space for this and other programs. The types of spaces to receive technology education systems include classrooms, engineering labs, technology labs, construction education labs and classrooms, JROTC classrooms, a Satellite Cafeteria for Seniors, graphics and printing labs, communication technology labs and a video production control room. Specified systems include custom instructor’s stations and wireless networking systems. Design responsibilities commenced from the schematic design phase through construction administration of the installed systems and finishes. Additional responsibilities include recommendations for room shaping and finishes for all acoustically sensitive spaces. This project has been successfully complete since Fall 2007.[/col3]

[col3]Architect: GWWO, Inc.
Location: Essex, Maryland
Construction Cost: $10 Million
Project Size: 60,000 gsf

[/col3]

https://ctdginc.com/wp-content/uploads/2024/06/CTDG-Convergent-Technologies-Design-Group-Inc-Logo-on-Blue.png 1000 1500 admin https://ctdginc.com/wp-content/uploads/2024/06/Convergent-Technologies-Design-Group-Logo_340x156px-72dpi_Green-and-Black-Logo.png admin2018-05-11 18:17:572024-12-31 10:04:45Baltimore County Public Schools – Kenwood High School
Audiovisual, K-12, Projects, Telecommunications

Baltimore County Public Schools – Cockeysville Middle School

[col3]The scope of this project included complete design services for telecommunications cabling systems with associated infrastructure and audiovisual systems infrastructure as they pertain to the systematic renovations at Cockeysville Middle School. The one-story building, constructed in the mid-1960s, required upgrades to general and specialty classrooms and building systems to support the renovation. Renovated spaces include seven science classrooms and laboratories. Project responsibilities include identifying wireless access points, and planning audiovisual systems infrastructure to support ceiling mounted projectors, equipment racks and instructor’s stations. Systems infrastructure was designed to future proof the renovated spaces and their programmed uses. This project was a two-year design and construction effort completed in August 2007.[/col3]


[col3]Architect: Colimore Thoemke Architects
Location: Cockeysville, Maryland
Construction Cost: $11 Million
Project Size: 186,000 gsf[/col3]

https://ctdginc.com/wp-content/uploads/2024/06/CTDG-Convergent-Technologies-Design-Group-Inc-Logo-on-Blue.png 1000 1500 admin https://ctdginc.com/wp-content/uploads/2024/06/Convergent-Technologies-Design-Group-Logo_340x156px-72dpi_Green-and-Black-Logo.png admin2018-05-11 18:16:302024-12-31 10:04:52Baltimore County Public Schools – Cockeysville Middle School
Audiovisual, Emergency Operations, Projects, Public Safety, Telecommunications

Baltimore City Public School System – Police Headquarters Command Center & Monitoring Facility

Data Centers: Prince Georges Community College, Center for Health Studies
Data Centers: Prince Georges Community College, Center for Health Studies
Data Centers: Prince Georges Community College, Center for Health Studies

[col3]Working directly with the Baltimore City School System, the scope of this project includes complete design services for audiovisual systems for the school police dispatch office. Specified systems include a command center video wall, remote location camera access, streaming video recording and viewing hardware, multiple computer screen access with custom control and configuration, and real-time preset recall of standard viewing and emergency incident dispatch. Responsibilities include specifications for all audiovisual equipment, project management inclusive of construction administration, training and testing, and detailing the demolition of existing systems. The Command Center features a multiple display video wall connected to security systems at each Baltimore City School enabling secure monitoring from a remote location. Additional project responsibilities include providing telecommunications connectivity between the renovated spaces and an existing server room. Project challenges include detailing the integration with existing systems and a fast-track design/deliverable schedule. This facility has been in use since early 2010.[/col3]

[col3]
Location: 
Baltimore, Maryland
Systems Cost: $70,000[/col3]

https://ctdginc.com/wp-content/uploads/2024/06/CTDG-Convergent-Technologies-Design-Group-Inc-Logo-on-Blue.png 1000 1500 admin https://ctdginc.com/wp-content/uploads/2024/06/Convergent-Technologies-Design-Group-Logo_340x156px-72dpi_Green-and-Black-Logo.png admin2018-05-11 18:15:572024-12-31 10:05:00Baltimore City Public School System – Police Headquarters Command Center & Monitoring Facility
Page 7 of 9«‹56789›»

Recent Posts

  • Outstanding Design Award!
  • Outdoor Audiovisual System Solutions at Eastern Carolina University
  • Project Spotlight: The Zayed Bloomberg Building Underwent a Major Upgrade for Next-Gen Healthcare
  • Project Spotlight: Grand Opening of the New Stockton University Residence Hall
  • Project Spotlight: USDA Forage-Animal Production Research Unit at the University of Kentucky

Categories

  • Acoustics
  • Audiovisual
  • Award Received
  • Business Schools
  • Court Rooms and Law Schools
  • Cultural
  • Data Centers
  • Emergency Operations
  • Federal
  • Healthcare
  • Higher Education
  • Hospitality
  • Hospitality and Gaming
  • HVAC
  • K-12
  • LEED
  • Libraries
  • Lighting
  • low voltage healthcare
  • Markets
  • Municipal
  • Museums
  • News
  • Projects
  • proton
  • Proton Center
  • Public Safety
  • Radio TV and Recording Studios
  • rec and wellness
  • Schools of Health
  • Science and Technology
  • Security
  • Telecommunications
  • Theaters and Performing Arts
  • Uncategorized

ARIZONA
4651 South Lakeshore Drive
Tempe, Arizona 85282
v: 480.345.9951
f: 480.345.9952

NEW YORK
448 W 37th Street, 7D
New York , New York 10018
v: 646.475.5116
f: 646.475.5117

MARYLAND
6501 York Road
Baltimore, MD 21212
v: 410.532.2395
f: 410.532.2396

ARIZONA
4651 South Lakeshore Drive
Tempe, Arizona 85282
v: 480.345.9951
f: 480.345.9952

NEW YORK
448 W 37th Street, 7D
New York , New York 10018
v: 646.475.5116
f: 646.475.5117

MARYLAND
6501 York Road
Baltimore, MD 21212
v: 410.532.2395
f: 410.532.2396

©2025 Convergent Technologies Design Group, Inc. All rights reserved.

Site designed by Mostyn Marketing Group / Built Creative.   |   Privacy Policy   |   Terms of Use   |   Site Map

  • Link to LinkedIn

©2025 Convergent Technologies Design Group, Inc. All rights reserved.

Site designed by Mostyn Marketing Group / Built Creative.

Privacy Policy   |   Terms of Use   |   Site Map

  • Link to LinkedIn

Scroll to top Scroll to top Scroll to top