LOCATION: Wye Mills, Maryland ARCHITECT: Marshall Craft Associates Baltimore, MD Description Chesapeake College is a two-year college on the Eastern Shore of Maryland that provides associate degrees, certificates, and other programs. It was the first regional community college in the state of Maryland. Convergent Technologies Design Group, Inc. (CTDG) has been asked to provided telecommunications
+ Read More
Convergent Technologies Design Group, Inc. (CTDG) has been asked to provide low-voltage systems design with associated supporting infrastructure for the Sacred Heart University Bennett Hall project located in Fairfield, Connecticut. Convergent Technologies Design Group will develop CSI-format specifications for access and security control surveillance systems, audiovisual systems and telecommunications cable systems. As well as develop
+ Read More
LOCATION: Hong Kong ARCHITECT: Bard, Rao + Athanas Consulting Engineers, PC New York, New York Description The latest in cancer radiation treatment, the Hong Kong Proton Therapy Facility will be offered as an alternative treatment center for cancer patients, especially children. Convergent Technologies Design Group, Inc. (CTDG) has been asked to provide telecommunications cabling systems
+ Read More
Description Arizona State University (ASU) is a public metropolitan research university on five campuses across Phoenix, Arizona area, and four regional learning centers throughout Arizona. ASU has twice been ranked as the #1 for innovation in among American schools by U.S. News & World Report. Staying up to date technologically is imperative to being innovative,
+ Read More
LOCATION: Liberty Township, OH ENGINEER: BR+A (Bard, Rao & Athanas Consulting Engineers) New York, New York ARCHITECT: TK&A Architects Cambridge, MA CONTRACTOR: Joint Venture of: Messer Construction Cincinnati, OH Linbeck Group Houston, TX PROJECT COST: $118 MILLION PROJECT SIZE: 80,000 GSF DESCRIPTION Located on the Cincinnati Children’s Medical Center Liberty Campus, the new proton facility
+ Read More
Architect: SmithgroupJJR Location: National Harbor, DC Project Size: 3,347,856 GSF Construction Cost: $925,000,000 Convergent Technologies Design Group, Inc. was engaged by SmithgroupJJR to provide Telecommunications, Acoustics, and Security design services for the MGM Resorts International National Harbor project located in Washington, DC. The new Building will be on 23 acres and will consist of
+ Read More
Telecommunications Infrastructure Planning and Design Services PBX systems & electronics expansion/voice over IP (VOIP) Local area network (LAN) switch electronics Wireless (WI-FI) LAN access points & coverage distribution analysis Structured horizontal cabling systems Vertical riser/telecommunications Main distribution frame (MDF) & intermediate distribution frame (IDF) design Campus utilities masterplanning Telecommunications hub relocations Direct buried, ductbank, directional bore,
+ Read More
Architect: Flynn Battaglia Architects Location: Buffalo, NY Project Size: 480,000 GSF Project Budget: $56,400,000 Convergent Technologies Design Group, Inc. (CTDG) was engaged by Flynn Battaglia Architects to provide audiovisual, telecommunications, and security design services for the Richardson Olmsted Complex Core Project located in Buffalo, New York. The 140 year old renovated building will feature
+ Read More
Architect: JLG Architects Location: Grand Forks, North Dakota Project Budget: $124,000,000 Project Size: 378,000 GSF The University of North Dakota is building a new home for the School of Medicine and Health Sciences. The new building will house of all the schools educational, service, and research programs. Previously these programs had to be housed on
+ Read More
Williamsburg, VA Architects: BCWH Architects, McMillan Pazdan Smith Architecture Construction Cost: $20,000,000 needed. This project will include a new press box/suite above the stands and 3,300 additional grandstand seats. It also includes tv/radio broadcast booths and new camera decks for televised games. The new plan incorporates two suites new restrooms, an elevator, and an updated
+ Read More
Architect: SmithGroupJJR Location: Rochester, MI Project Budget: $74.6 Million Square Footage: 127,000 gsf Convergent Technologies Design Group was asked by SMithGroupJJR to design telecommunications cabling systems with associated infrastructure for voice/data/RF video outlets, audiovisual systems with associated supporting infrastructure, access control/video surveillance systems, and LAN/PBX/Wi-fi electronics design services. Individual audiovisual systems were designed for various
+ Read More
Location: Bel Air, MD Architect: HKS, Inc. MEP Engineer: BR+A Construction Cost: $35.6 Million Gross Square Footage: 111,000 square feet The Cancer Center Addition to the Upper Chesapeake Health campus is a technology rich building designed to provide state of the art medical treatment. The building has also been designed to support current business,
+ Read More
Architect: Heery International Departments: Nursing Radiology Nuclear Medicine Emergency Technician Paramedic Training Dental Hygiene Optometric Assistant Pharmacy Technician Data Center Location: Largo, Maryland Construction Cost: $36.5 MILLION Square Footage: 110,000 gross square feet The scope of this project includes complete design services for audiovisual systems, telecommunications cabling systems, and acoustics, noise & vibration
+ Read More
Architect: Moseley Architects Location: Blacksburg, Virginia Construction Cost: $9 Million Project Size: 49,000 gsf LEED: Gold Description The scope of this project includes complete design for all telecommunications and audiovisual infrastructure as it relates to the renovation of Henderson Hall, the oldest building on the Virginia Tech campus. Space plans include: a 8,000 sq. ft.
+ Read More
Moseley Architects; Hastings & Chivetta Architects Location: Fredericksburg, Virginia A/V Budget: $1 Million Project Size: 155,000 gsf The scope of this multi-phase project includes complete design services for the following technology systems: digital audiovisual presentation, program/speech audio reinforcement, and telecommunications cabling (voice, data, RF Video), Phase I of the project includes the expansion of Goolrick
+ Read More
Architect: Ellerbe Becket Location: Stafford, Virginia Project Size: 225,000 GSF Construction Cost: $110 MILLION The new Stafford campus of the MediCorp Health System is home to a 100-bed acute care hospital including a medical/surgical unit, intensive care unit, labor and delivery unit, full- service emergency department, imaging center, and medical office space. The project
+ Read More
4651 South Lakeshore Drive
Tempe, Arizona 85282
v: 480.345.9951
f: 480.345.9952
448 W 37th Street, 7D
New York , New York 10018
v: 646.475.5116
f: 646.475.5117
6501 York Road
Baltimore, MD 21212
v: 410.532.2395
f: 410.532.2396